Product Details


+
  • 48338.png
  • p23.jpg

KG cement-based permeable crystalline waterproof coating

KG cement-based permeable crystalline waterproof coating is a powder material synthesized by a special process of high-performance active masterbatch, Portland cement and quartz sand.

Key Words

KG cement-based permeable crystalline waterproof coating

Kaiguang Waterproof

Rubber waterproof


Classification

Cement-based waterproof material series


Product Details


  Product Description:

KG cement-based permeable crystalline waterproof coating is a powder material synthesized by a special process of high-performance active masterbatch, Portland cement and quartz sand.

  Product features:

1. The product is non-toxic, non-polluting, green and environmentally friendly, and safe to use.

2. In the concrete structure of the back surface and the surface of the water can be used for construction.

3. Suitable for wet (no water) on the grass-roots construction.

4. No need to do protective layer after construction.

5. No construction joints, easy to use, simple to operate.

6. It can naturally heal cracks below 0.1mm, protect steel bars and prevent corrosion of steel bars.

Scope of application

1. Waterproof and anti-seepage works of swimming pool, drinking water pool, sewage pool, ornamental pool and dam.

2. Waterproof and anti-seepage works for basement, underground sewer, elevator shaft, balcony and toilet.

3. Municipal engineering, especially the waterproof and anti-seepage project of pile head.

  Main technical indicators:

  GB 18445-2012

Test ItemsTechnical indicators
Moisture content/% ≤1.5
Fineness, 0.63mm screening/% ≤5
ConstructionAfter adding water and stirringScraping without barrier
20minScraping without barrier
Bending strength/Mpa,28d ≥2.8
Compressive strength/Mpa,28d ≥15.0
Bond strength of wet surface/Mpa,28d ≥1.0
Impermeability of mortarImpermeability pressure of coated mortar a/Mpa,28dReport the measured value
Impermeability pressure ratio (with coating)/%,28d ≥250
Impermeability pressure of mortar to remove coating a/Mpa,28dReport the measured value
Impermeability pressure ratio (coating removal)/%,28d ≥175
A benchmark mortar and benchmark concrete 28d impermeability pressure should be 0.4. 0.0-0.1Mpa, and listed in the product quality inspection report.

 

 Key points of construction

Basic requirements

1. Construction must be strictly in accordance with the design regulations.

2. Base surface treatment: the base surface is required to be smooth, firm, clean, free of open water and oil stains. The uneven and cracks must be leveled first, and the leakage must be blocked first. The dry base surface needs to be watered before construction, but there can be no accumulated water.

Use Reference

1. Coating method: first add water into the barrel, then add powder according to the proportion, mix the weight ratio of powder: water = 4:1 (depending on the construction environment), fully stir with an electric mixer for 3-5 minutes, and then use a brush or roller to paint vertically on the treated base surface, with an interval of about 3-4 hours and a thickness of 1mm, the dosage is about 1.5~2.0kg/㎡.

2. Dry powder spreading method: the material is evenly sprinkled on the wet cushion before the cushion is poured concrete, which should be completed within half an hour before the concrete pouring. The dosage is about 1.5~2.0kg/㎡.

3. The method of tamping with light: when the newly poured concrete plane just reaches the initial set, the material is evenly spread on the surface, and then calendered with a trowel or machine. The dosage is about 1.5~2.0kg/㎡.

4. maintenance: under natural conditions for about 4 days of maintenance (sprinkling), for too dry construction environment can be covered with wet blanket maintenance.

  Precautions

1. The prepared slurry shall be used as it is prepared, and the dried slurry shall not be reused with water.

2. The product shall be transported to prevent rain, exposure, freezing, extrusion and collision, and shall be stored in a dry, cool and ventilated warehouse at not less than 5 ℃.

3. The construction temperature of 5~35 ℃, try to avoid outdoor construction in high temperature, frost, direct sunlight or windy and rainy weather.

Product shelf life is 12 months.

  Reference Dosage

When the thickness of waterproof coating is 1mm, the dosage is about 1.5~2.0kg/m2.

  Packing specification

20 kg/bag

20kg/barrel

Recommend products

The company has a series of EPDM synthetic polymer membrane and waterproof coating, at the same time has a variety of superior performance of the rubber tube, widely used in modern industrial production.


Message consultation

We value your suggestions and comments. If you have any questions about our products and services, please fill in the form below and we will contact you as soon as possible!


Submit